Dante Valve Company, Inc.

 

Testing Capacities

  • 3000 PSIG Gas Fired Boiler with a 21 cubic feet/800 PSIG Horizontal Test Vessel with 3" & 4" Test Connections
  • 1,000 PSIG Air Compressor with four (4) 26 cubic feet/1,000 PSIG Horizontal Accumulators and a 31 cubic feet/1,000 PSIG Vertical Test Vessel with a 4" Test Connection
  • 1,000 PSIG Liquid (Air over Water) with four (4) 26 cubic feet/1,000 PSIG Horizontal Air Accumulators and a 35 cubic feet J-Tube Test Vessel with a 4" Test Connection